Thursday, September 22, 2011

Progress now

Electric should be wrapped up this week, with the inspection next week. Then the plumbing will get finished and inspected.
Some more items include:
fixing the front stairs
installing the main staircase
concreting the back patio
adding concrete support to areas in the bottom level
installation of the heating system
framing inspection
then insulation and drywalling.
No more timelines. I don't have a clue. Especially after getting dumped on by Irene and the delay caused by that. Several feet of water in the basement, two feet on the street. Luckily there was nothing in the house to get damaged yet, and it's all fine now.
PS I'm tired of this.