Started on Monday. As of an hour ago, the entire second floor is ripped down to the studs. the first floor is almost there. Then comes the bottom level.
Once the demo is done, though, we'll have to wait. While the neighbors finally agreed to having the water line replaced, the excavator (the guy who rips the street up) is booked until March 8. I'm getting used to delays, and this should be the last big one.
I'll post pix of the demo this weekend.
No comments:
Post a Comment