The basement, thanks to the French drains and sump pump, weathered the monsoons of May and came out dry. The plumbing lines are laid, gravel piled on top, and now we're waiting for the plumbing inspector to sign off so we can seal it up with concrete and resume work on the rest of the house.

The inspector was supposed to come Friday, but didn't, then Tuesday, but didn't, and now today, supposedly. That's the system.