These are some of the main things that still need to be done:
1. build stairs from living room down to kitchen, and from kitchen down to basement
2. electrical
3. run the plumbing lines into the kitchen and up to the top floor bathroom
4. run the water lines
5. duct work
6. main staircase from living room to bedrooms
7. drywall
8. finish the siding
Those are just the big items. Never ending .
No comments:
Post a Comment